Details

Wanted Energy project investors
Mannar
LOCATION ( SRI LANKA )
260 Acres
LAND EXTENT
USD 150 Mn
MINIMUM INVESTMENT
Project overview
Phase II of the Mannar Wind Energy project with a capacity of 100 MW, will be combined with a 5km 132 kV transmission line. The proposed wind farm will comprise state-of-the-art modern wind turbines with the required grid support features to facilitate a semi-dispatchable operation as done in the Phase I project by Ceylon Electricity Board. The proposed turbines are to be located 2 km away from the existing wind turbines.

Operation period: 20 years
This project will deliver 380-400 GWh per annum leading to 265,731 tonnes of CO2 by way of reducing thermal power generation
The calculated levelized cost of energy is US$ 0.046 per kWh, which is close to the cost of energy of the existing 100 MW wind farm operated by CEB.
Project/ownership structure
Build, Own, Operate and Transfer (BOOT)

Learn More

Sign up for a free membership. Get instant access to thousands of listings. Learn about our membership plans.

Disclaimer: DealStream has not independently verified any of the information in this listing and makes no warranty as to its accuracy or completeness. This listing does not constitute an offer to sell, solicit or make an offer to buy an investment interest. Offers to sell, or the solicitation of offers to buy, any security can only be made through official offering documents, such as a subscription agreement and private placement memorandum.