6 days agoWe offer a Hydroelectric Power Plant in Turkey.
Diversion Weir and HEPP Project has a capacity of 37.99 MW installed power, 4.60 GWh firm energy and 91.16 GWh secondary energy resulting a total energy of 95.76 GWh/year.
Discharge (m3/s) :72.00
MWe :37.99
GWh/year: 95.76
Type : Run of river
Start of operation : 11/2011
The plant is designed by Hidro Dizayn to Turkish standards. Some photos/drawings may give a first impression…
Drainage Area (km2) :4660,10
Upstream HEPP (yes/no) : Yes
Weir Type :Overflow, Uncontrolle
Average Flow (m3/s) : 27,79
Design Flow (m3/s) : 72,00
Tailwater level (m) :902.43 (4 units oprt.)
Gross head (m) : 60.10 (4 units oprt.)
Net head (m) :59.94 (4 units oprt.)
Installed Power (MWe/) :37.99
Total Energy (GWh/y) : 95.76

Weir Type : Run off river
Total conveyance system length (m) :5246.32
Total Penstock length up to branching point (m) :103.38
Grid Length (km) : 10
# of turbines :3+1
Turbine type : Francis, Vertical Axis
Electro-mech. supplier : Zhejiang Orient Engineering Co. Ltd
Annual Revenue: 6,000,000USD

January 2019 - October Production value: 69.963.996KWh
KWh unit sales value: $ 0.073
KWh Government Contribution (until the end of 2023): 0.01TL.
69.963.996 KWh X 0.073 $ = 5.107.371 $ + VAT
69.963.996 KWh X 0.01 TL. = 699.639 TL.
November - December 2019 production is not included.

Learn More About This Listing

Sign up for a free basic membership to start buying and selling. Learn about our membership plans.

By clicking "Join Now - It's Free" you confirm that you accept the Terms of Use and Privacy Policy, including cookie use.