Description

The Ranken Turkey Creek Drilling Program consists of one development project referred to as the Edge Prospect. The primary targets for the prospect are the Bois d'Arc portion of the Hunton formation and the 1st Bromide Sand. The proposed location is a direct offset and structurally up dip to two Bois d'Arc wells that produced 104,112 and 75,848 BO respectively. The proposed location is also up dip from a 1st Bromide hydrocarbon show in a well to the north that produced 38,482 from the Bois d'Arc. The prospect is a robust geologically and geophysically defined prospect due to the well control surrounding the prospect and our proprietary 3-D seismic data confirming the structural conclusions as presented.

Posted Mar 21, 2016

Did you know that social networking is a great way to buy a business? Sign up now and we'll show you how.

By clicking "Sign Up" you confirm that you accept the Terms of Use and Privacy Policy, including cookie use.

Disclaimer: DealStream has not independently verified any of the information in this listing and makes no warranty as to its accuracy or completeness.